A bike shop or small manufacturer that builds complete bikes from components has two inventory realities to reconcile: the components (each a sellable SKU in its own right) and the finished bike (a sellable SKU with its own frame number). Vedron handles the build with a bill of materials, work-in-progress tracking, and automatic frame-number assignment at completion.
The two inventory realities
A frame, a fork, a wheelset, a groupset, a cockpit and a saddle can be sold separately as spare parts. The same six items, assembled, become a complete bike SKU. The accounting needs:
- The components to remain sellable until consumed in a build
- The build to consume them in the right ratio
- The finished bike to carry its own identity (frame number, serial)
- The cost of the finished bike to equal the sum of the component costs plus labor
Bill of materials against the finished bike SKU
Every finished bike SKU in Vedron has a BOM against it: a list of component SKUs with quantities per build (usually 1 of each). The BOM is versioned, so a model change (a saddle swap mid-season) updates the BOM for new builds without affecting bikes already built.
For a shop with 20 configurations (same frame, different builds), the common pattern is one BOM per configuration with the shared components reused across BOMs.
The build order flow
A build order is created in Vedron with:
- The finished bike SKU to produce
- The quantity (usually 1 for a bespoke build, 5 to 20 for a batch)
- The location where the build will happen
- The scheduled completion date
- The frame number range to assign (or auto-assign from the serialised stock pool)
On opening the build order, the component stock figures move from “available” to “allocated to build order N”. The components are no longer promised to Allegro, Shopify or in-shop sale.
Work in progress
While the build is in progress, the components are in WIP. The accounting shows WIP as a separate line on the balance sheet, equal to the cost of the components consumed to date plus any labor booked. For a shop that builds 20 bikes a month, WIP typically runs at 10 to 30k EUR at any time.
Completion and frame-number assignment
When the build is marked complete:
- The finished bike SKU gains one unit of stock per build, each with its own frame number
- The components are consumed from “allocated to build order” (zeroed out)
- The WIP account is cleared and the cost moves to finished-goods inventory
- The finished bike is now available to sell on every channel the SKU is listed on
Frame numbers can be assigned manually (typed in by the technician) or auto-generated from a sequence per model. Each frame number stays with the individual unit through the sale, the warranty and any future service case.
Labor and overhead
Labor can be booked against the build order as hours at a chargeable rate. Overhead (shop allocation, consumables, workshop rent) can be applied as a flat per-build figure or as a percentage of labor.
The resulting finished-bike cost is the sum of component costs plus labor plus overhead, which is used as COGS when the bike is sold. The analytics view (post 142) shows the per-bike margin accurately, which matters for custom builds where price is set per build.
Returns and warranty
A bike returned under warranty with a frame fault can be stripped: the components in good condition move back into component stock as sellable, the frame is written off, and the bike’s frame number is marked as retired. The audit trail of what happened to each component is captured, which matters for warranty claims against the frame supplier.
FAQ
Can my components still be sold separately while a build is in progress?
Only until the build order is opened. On opening, the component stock moves from “available” to “allocated to build order”, so the storefront and marketplace listings see the updated available figure immediately. If the build is cancelled, the allocation reverses.
How are frame numbers assigned?
Manually typed by the technician, or auto-generated from a sequence per model. Each frame number stays with the individual unit through sale, warranty and service. See post 147 for the full tracking workflow.
Does the finished bike’s cost include labor?
Yes. Labor hours booked against the build order are added at a chargeable rate. Overhead can be applied as a flat per-build or as a percentage of labor. The resulting finished-bike cost is used as COGS when sold.
How does Vedron handle a warranty return where the frame is faulty but the components are good?
The bike is stripped against a return workflow. Components in good condition return to component stock as sellable; the frame is written off; the frame number is retired. The audit trail is captured for the supplier warranty claim.
Can I run different BOMs for different bike configurations with shared components?
Yes. Each finished-bike SKU has its own BOM. Shared components appear in multiple BOMs; the BOM versioning tracks changes over time without affecting bikes already built.