Seasonal demand is predictable in shape and unforgiving in timing. A road-bike supplier with a 90-day lead time needs the order placed in January for a March to June peak. A Christmas gift SKU needs ordering in July or August. Vedron produces reorder suggestions that account for the SKU’s own seasonality, the supplier’s actual lead time, and the current stock position across every location.
Why a flat reorder rule misses
A flat reorder point (post 141) catches continuous demand well. It fails on seasonal demand for two reasons:
The ramp. When demand ramps from 2 units a week to 50 units a week over three weeks, the flat reorder point triggers too late. By the time the alert fires, the ramp is already underway and the supplier lead time means the reorder arrives after the peak.
The off-season. During the off-season, a slow-moving seasonal SKU looks like a slow mover forever. The flat rule can suggest no reorder when a 90-day lead time means now is the right time to buy for next season.
The forecasting method
Vedron uses historical sales per SKU per calendar week as the base signal, with up to three years of history where available. For each SKU, the model fits a seasonal profile (52 weekly coefficients) and a trend.
The reorder suggestion for a given week equals:
Forecasted sales over the lead time
+ safety stock
- current stock on hand
- stock on order
If the SKU has 90 days of lead time, the forecast integrates the next 90 days of expected sales from the current week forward. The reorder prompt fires when the result is positive.
Lead time variance
Supplier lead times vary. Vedron tracks actual lead time per supplier per SKU from PO date to goods-in date. If a supplier typically delivers in 60 days with a standard deviation of 10 days, the model uses 70 days (one standard deviation above the mean) as the planning lead time to protect against the long tail.
For critical SKUs (A-class under post 141), the planning lead time can be set to two standard deviations above the mean.
Promotional lift
A planned promotion changes the forecast. A seller planning a 25 percent discount on a SKU for a week in May can enter the promo in Vedron, which adjusts the forecast upward for that period by the historical lift from similar promotions on comparable SKUs.
Without a historical reference, the operator enters an expected lift factor manually. The suggestion is then adjusted and the reorder quantity reflects the promotion.
Multi-location
Forecasts and reorder suggestions are per location per SKU, not global. A regional shop with a different seasonal pattern (for example a mountain-town bike shop with a longer summer peak) gets a different suggestion than the main warehouse.
Interbranch transfers are suggested where one location has surplus for the forecast and another is short, before suggesting a new supplier order.
New products with no history
For a new SKU with no sales history, the forecast uses a reference SKU chosen by the operator. The operator maps the new SKU to a predecessor or to a comparable SKU, and the forecast uses the comparable SKU’s historical pattern until the new SKU has 12 weeks of its own data.
FAQ
What historical data does the forecast use?
Up to three years of weekly sales per SKU per location. The model fits a seasonal profile (52 weekly coefficients) and a trend. Three years is enough to pick up most consumer-goods seasonality; one year works for stable patterns.
How does Vedron handle supplier lead time variance?
Actual lead time is tracked per supplier per SKU from PO date to goods-in. The planning lead time is set at one standard deviation above the mean (or two, for critical SKUs), so the reorder is placed in time even when the supplier runs long.
Can I adjust the forecast for a planned promotion?
Yes. Enter the promotion period and the expected discount in Vedron. The forecast lifts for that period using the historical lift from similar promos on comparable SKUs. For a SKU with no reference, enter a manual lift factor.
What about a brand-new product with no sales history?
Map the new SKU to a reference SKU chosen by the operator (a predecessor or a comparable). The forecast uses the reference SKU’s seasonal pattern until the new SKU has 12 weeks of its own history.
Does Vedron suggest interbranch transfers before new orders?
Yes. For a multi-location setup, if one location has surplus against its forecast while another is short, Vedron suggests a transfer before firing a new supplier reorder. The seller sees both options.
